Production and office complex is located close to the planned transport corridor of the Slavetice village southern bypass.
A production and administrative complex is located only 3.2 km far from the main gate of the Dukovany nuclear power plant. The complex is divided into four blocks.
Three administrative and one production block. The administrative block is planned as four floor building(plus one floor in the basement). Each floor could be split up vertically with separated entrance for each floor. The production and assembly hall can also be split up as needed.
All blocks of the centre is connected by a bridges at the same floors to create one level area. The covered space between the blocks could be used as manipulation or parking place. The centre provision is allowed from the entrance side. The centre location includes sufficient amount of covered and opened parking places and small garden inside. The place is protected by industrial fence.
Location and distances:
- Centre of Trebic city: 23,2 Km - 20 min.
- Dukovany NPP main entrance gate: 3,2 Km - 2 min.
- Centre of Brno city: 50,1 Km - 55 min.
The centre dimenstions:
- Total area: 10 000 m2
- Constructed area: 2 934 m2
- Manufacturing floor area: 700 m2
- Office floor area: 5 000 m2
- Estimated employee capacity: 500